DAS JORIS – Your New Home
Living on the border with the 3rd District
At Rinnböckstrasse 20, 50 modern 2- to 4-room apartments with 32-115 m² are being built, all with balconies, loggias, terraces or private gardens.
The project stands out for its sustainable energy supply via deep drilling and a heat pump, Klimaaktiv Gold certification, and custom-built brand-name kitchens.
Additional comfort features include ceiling cooling, electric exterior shading, and electric parking spaces.
The prime location near the U3 subway line ensures excellent connectivity and high rental potential. Condominiums available starting at €237,500.
Folder
Location with potential
Rinnböckstraße is located at the border between the 3rd and 11th districts. A five-minute walk to the U3 subway line. Direct access to downtown. Close proximity to workplaces, green spaces, and local amenities.
Neu Marx continues to evolve as a hub for media, research, and technology. The Gasometer is just one subway stop away. Hyblerpark is located right nearby.
The quality of the situation is structural—not coincidental.
Architecture with a clear vision
The building consists of a basement, a ground floor, four upper floors, and two attic floors. A central stairwell with an elevator provides access to all levels.
The landscaped courtyard provides a buffer from the urban environment and creates private open spaces.
All 50 apartments feature a balcony, loggia, terrace, or private garden.
Here, living means having a private outdoor space as a natural part of the experience.
Sustainability as the standard
DAS JORIS is being built to meet the klimaaktiv GOLD standard—the highest government-recognized quality rating.
Energy is supplied via deep boreholes and a heat pump. Heat distribution and cooling are provided through structural heat storage in all residential units.
This ensures a comfortable indoor climate—in both summer and winter.
Here, energy efficiency is not just an added feature, but an integral part of the building's quality.
Well-appointed
Solid wood parquet flooring in the living areas.
Triple-pane windows.
Electric exterior shading.
Modern bathrooms.
Custom-built kitchens with brand-name appliances.
Minimalist in design. High-quality in craftsmanship.
Key Technical Specifications
Start of construction: September 2025
Scheduled completion: Spring 2027
HWB: 26.50 kWh/m²a (Class B)
fGEE: 0.74 (Class A)
Condominiums starting at €237,500.